Monday, October 13, 2014

Fly ash Flyash Brick manufacturing Process




Fly Ash + Gypsum + Lime + Crusher Dust
↓ ↓ ↓ ↓
---------------------------------------------------------------------------------
Weighing
Pan Mixer
Conveyor
Fly Ash Brick Making Machine
(Hydralic (or) Power Press)
Transported To Wooden Racks
Kept as it is
for two days for setting
Water Curing
(7 to 10 days)
Drying
(one or two days)
Sorting and Testing
Dispatch

1 comment:

  1. Good one you explain. all building and civil related work to must use for the pre engineering process is very well done to introduce. Majorly access material is boom lift rental for access and tools used for core work. Thanks for the opportunity. and Thanks for post and creadited to Sendhamarai Engineering.